India’s Longest River Bridge Nears Completion

Shillong: Construction crews have finished 76 percent of the massive Dhubri-Phulbari bridge. The span stretches 19.3 kilometers across the Brahmaputra River to link Meghalaya and Assam. It will be the longest river bridge in India.

Workers have completed 74 percent of the financial targets for the project. Larsen and Toubro is building the four-lane structure on NH-127B. The total price tag hits 4,997 crore rupees. A JICA loan covers the cost. NHIDCL officials expect the work to wrap up by September 2028.

The design includes 199 pillars. It turns a massive detour into a straight shot. Drivers currently face a long haul between the two states. The new link will cut the trip by more than 200 kilometers.

NHIDCL officials expressed optimism that the work will be completed within the scheduled timeframe. This project serves as a major boost for Northeast infrastructure. It aims to move goods faster and spark economic growth once traffic starts flowing.

Disclaimer: The views and facts expressed here are solely those of the independent citizen journalist, researcher, and others, who assumes full responsibility for the content's accuracy and legality. Any third-party media (images, videos, or audio) used belongs to its respective owners and is shared strictly for reporting, criticism, or review under the "Fair Dealing" provisions of Section 52 of the Copyright Act, 1957 (India). NEWire.in does not claim ownership over such material and reserves the right to review, moderate, or remove content at its sole discretion upon receiving valid legal concerns or grievances.

Comments
Please login to comment.

Related Reports