#Siang Dam

Adi group demands Siang dam answers from Chief Minister Khandu

The ABKU is demanding clarification from CM Pema Khandu over conflicting statements regarding the 11.2 GW Siang Upper Multipurpose Project in Arunachal.

Tani M • 19 Nov 2026

Adi Group Demands Conditions Met Before Siang Dam Talks

The Adi Ba Kebang United set four strict demands for the Arunachal government before participating in talks regarding the Siang dam project.

Rinchen K • 14 Nov 2026

Anti-Dam Protesters Reach Assam in March Against Siang Hydropower Project

Protesters marched into Assam to oppose the 11,200-MW Siang dam project, demanding the release of detainees and an end to government development activity.

Bibar Daimary • 12 Nov 2026

Nagaland Group Backs Adi Protests Against Siang Hydropower Dam

The Sustainable Development Forum Nagaland demands the government pull security forces and respect indigenous rights amid Siang dam project protests.

Naro Jamir • 8 Nov 2026

Arunachal Pradesh Tensions Mount Over Proposed Siang Dam Project

Officials push for dialogue as security forces flood the Siang valley. Protesters refuse to negotiate until detained activists are released.

Tani M • 8 Nov 2026

CPI Members Stage Guwahati Protest Over Assam Floods and Siang Dam

Assam CPI leaders held a rally in Guwahati to demand flood relief and oppose the Siang Dam project, citing regional environmental and safety concerns.

Timungpi Terang • 7 Nov 2026

Protesters enter Assam to block massive Siang dam project

Protesters from Arunachal Pradesh marched into Assam to demand the cancellation of the 11,200-MW Siang dam project amid growing local opposition.

Bibar Daimary • 7 Nov 2026

Itanagar Shutdown Over Siang Dam Protests Sees Mixed Results

A 12-hour shutdown in Itanagar triggered mixed results as protesters demand the release of detainees and an end to a mega-dam project in Siang.

NEWire Desk • 4 Nov 2026

Rajesh Kumar Named Arunachal Police Chief Amid Dam Protests

Rajesh Kumar takes over as Arunachal Pradesh DGP as locals push back against the massive Siang hydropower project.

Rinchen K • 4 Nov 2026

Arunachal Districts Paralyzed by 36-Hour Bandh Against Mega Dam Project

Indigenous groups shut down three Arunachal Pradesh districts, demanding the release of activists and a halt to the 11,200-MW Siang dam survey.

Rinchen K • 2 Nov 2026

Arunachal CM Pema Khandu Stalls Siang Dam Plans

Arunachal Pradesh CM Pema Khandu says no decision exists on the Siang dam project, promising public consent before any potential construction steps.

Tani M • 2 Nov 2026

Arunachal Deploys 30 Security Companies as Siang Dam Tensions Rise

Arunachal Pradesh sent 30 security companies to manage anti-dam protests as the state attempts to negotiate the 11,200-MW Siang river project.

Rinchen K • 27 Oct 2026

Land rights group fights Arunachal Pradesh dam project

The Bhumi Adhikar Joutha Sangram Samiti demands the release of four arrested leaders and calls for the total cancellation of the 11,000-megawatt Siang dam.

Bibar Daimary • 24 Oct 2026

Violent Clashes Erupt Over Arunachal Pradesh Mega Dam Project

Protesters torched an NHPC office and police vehicles in Arunachal Pradesh after a violent crackdown during a 12-hour bandh against a mega dam project.

Bibar Daimary • 23 Oct 2026

Congress Demands Release of Activists and Halt to Siang Dam Work

Arunachal Pradesh Congress demands the release of four detained activists and a stop to Siang dam field work, citing concerns over indigenous rights.

Tani M • 12 Oct 2026

Arunachal Chief Minister Pema Khandu Addresses Siang Dam Controversy

Pema Khandu says Siang residents are being misled over the proposed 11,000-MW dam project. He promises public consultations before moving forward.

Timungpi Terang • 6 Oct 2026

Congress Leader Urges President Murmu to Review Upper Siang Dam Impact

Debabrata Saikia asks President Murmu to assess the Upper Siang project's impact on Assam, demanding transparency and safety guarantees for the state.

Diana Moirangthem • 30 Sep 2026

Adi Community Demands Halt to 11,000-MW Siang Hydropower Project

Arunachal Pradesh's Adi community is pushing to scrap a massive 11,000-MW hydroelectric dam project over fears of land loss and ecological damage.

Rinchen K • 22 Sep 2026

Arunachal Rights Group Demands Halt to Siang Dam Project

Human Rights of Arunachal backs protests against the Siang Upper Multipurpose Project, demanding independent safety reviews and community consultation.

Tani M • 18 Sep 2026

Arunachal CM Pema Khandu Promises Dialogue Over Siang Dam Project

Arunachal Chief Minister Pema Khandu pledges to address community concerns regarding the proposed 11,000 MW Siang Upper Multipurpose Project through talks.

Tani M • 17 Sep 2026