Road project crumbles in Arunachal Pradesh

Itanagar: Newly constructed culverts along an unfinished highway in the Papum Pare district of Arunachal Pradesh have collapsed. The road connects Naharlagun to the Chessa River, Chengmara, and Kokila areas near the Assam border. It serves as a vital link to the Donyi Polo Airport at Hollongi. Damage to the structures has rendered parts of the route unusable.

Locals blame shoddy work and poor oversight. They argue that substandard materials and lack of monitoring caused the destruction. Skepticism now surrounds the Public Works Department and the contractors tasked with building the road. Residents are demanding a formal assessment of the site.

The public wants answers. They want authorities to verify construction standards and technical specifications immediately. One local source stated, "A technical inspection by the competent authorities could establish the reasons behind the failure of the culverts and determine responsibility, if any."

Commuters face significant travel delays as the road remains compromised. Officials face mounting pressure to fix the damage before continuing work. This failure has ignited a debate regarding accountability for infrastructure projects across the state.

Disclaimer: The views and facts expressed here are solely those of the independent citizen journalist, researcher, and others, who assumes full responsibility for the content's accuracy and legality. Any third-party media (images, videos, or audio) used belongs to its respective owners and is shared strictly for reporting, criticism, or review under the "Fair Dealing" provisions of Section 52 of the Copyright Act, 1957 (India). NEWire.in does not claim ownership over such material and reserves the right to review, moderate, or remove content at its sole discretion upon receiving valid legal concerns or grievances.

Comments
Please login to comment.