A massive pothole emerged on Assam's newly opened Kaliabor Tiniali flyover, sparking anger over the quality of construction after a 12-year wait.
Timungpi Terang • 28 Sep 2026
Crews filled a massive void under the Kaliabor highway following reports of structural failure. The road connects Nagaon and Tezpur, raising safety fears.
Timungpi Terang • 12 Aug 2026
A giant hole has opened beneath a new Assam highway stretch. Locals blame contractor Ganapati for shoddy work and demand immediate safety repairs.
Bibar Daimary • 11 Aug 2026